
Water — sorted from day one.
Municipal connection in place, with well as backup option
Utilities
💧 Municipal water supply
Connected
Municipal water supply
30–60m
Typical well depth
฿35k–80k
Well drilling cost
300+
Sunny days/year (solar)
The plot already has a municipal water connection in place — the pipe is there, the connection is made. This saves significant time and cost compared to plots where water infrastructure still needs to be arranged.
Once you begin construction, connecting your building to the existing supply is straightforward and handled by your contractor as part of standard site work.

Backup option
🪣 Drilling a well — a smart backup
Many villa owners in Hua Hin drill a private well as a secondary water source — particularly useful for garden irrigation, pool top-up, and as backup during any temporary supply interruptions.
Power
⚡ Electricity
Electricity is not yet connected to the plot but is available from the PEA (Provincial Electricity Authority) infrastructure along Soi 112. Connection is a standard process handled during construction.

Water connected. Ready to build.
Municipal water in place on Soi 112 — message us on LINE.
💬 LINE AgentThe information on this page is provided for general informational purposes only and does not constitute legal, financial, or tax advice. Tax figures, costs, and market data are indicative and based on publicly available sources as of 2026. Always seek independent legal advice before entering into any property transaction in Thailand. → Read our full disclaimer